3 Installation and commissioning
3.1 Introduction to installation and commissioning
General
This chapter contains assembly instructions and information for installing the CRB
1100 at the working site.
See also the product manual for the robot controller.
The installation must be done by qualified installation personnel in accordance
with the safety requirements set forth in the applicable national and regional
standards and regulations.
The technical data is detailed in section
.
Safety information
Before any installation work is commenced, all safety information must be observed.
There are general safety aspects that must be read through, as well as more specific
safety information that describes the danger and safety risks when performing the
procedures. Read the chapter
before performing any installation
work.
Note
Always connect the CRB 1100 and the robot to protective earth and residual
current device (RCD) before connecting to power and starting any installation
work.
For more information see:
•
Product manual - OmniCore C30
Product manual - CRB 1100
49
3HAC078007-001 Revision: J
© Copyright 2021-2023 ABB. All rights reserved.
3 Installation and commissioning
3.1 Introduction to installation and commissioning
Summary of Contents for CRB 1100
Page 1: ...ROBOTICS Product manual CRB 1100 ...
Page 162: ...This page is intentionally left blank ...
Page 184: ...This page is intentionally left blank ...
Page 652: ...This page is intentionally left blank ...
Page 698: ...This page is intentionally left blank ...
Page 712: ...This page is intentionally left blank ...
Page 714: ...This page is intentionally left blank ...
Page 719: ......