4.5 Lubricating activities
4.5.1 Lubricating the cable package
Location of the cable package
The CRB 1100 main cable package has two segments, upper and lower. Inside the
swing there is a division point.
The cable packages are located as shown in the figure.
Upper cable package
Lower cable package
xx1800002466
xx1800002465
Required tools and equipment
Note
Equipment
The content is defined in the section
.
Standard toolkit
Other tools and procedures may be required
if the spare part needs to be replaced. These
are specified in the replacement procedure.
Required consumables
Note
Article number
Consumable
FM 222
3HAC029132-001
Grease
Lubricating the cable package
Use this procedure to lubricate the cable package.
Information
Action
DANGER
Turn off all:
•
electric power supply
•
hydraulic pressure supply
•
air pressure supply
to the robot, before entering the robot
working area.
1
Continues on next page
176
Product manual - CRB 1100
3HAC078007-001 Revision: J
© Copyright 2021-2023 ABB. All rights reserved.
4 Maintenance
4.5.1 Lubricating the cable package
Summary of Contents for CRB 1100
Page 1: ...ROBOTICS Product manual CRB 1100 ...
Page 162: ...This page is intentionally left blank ...
Page 184: ...This page is intentionally left blank ...
Page 652: ...This page is intentionally left blank ...
Page 698: ...This page is intentionally left blank ...
Page 712: ...This page is intentionally left blank ...
Page 714: ...This page is intentionally left blank ...
Page 719: ......