![Thermo Scientific TSQ 9000 Скачать руководство пользователя страница 455](http://html.mh-extra.com/html/thermo-scientific/tsq-9000/tsq-9000_hardware-manual_1104856455.webp)
4
Upgrade Equipment
CI Reagent Gas Flow Module
Thermo Scientific
TSQ 9000 Hardware Manual
427
CI Reagent Gas Flow Module
The CI reagent gas flow module controls the flow of CI reagent gas into the ion source and is
located at the back left of the TSQ 9000 instrument. The module uses electronic pressure
control to precisely set the flow of reagent gas. The flow is programmed using the instrument
control software, which allows you to accurately reproduce flows. To install a new CI reagent
gas flow module:
1. Shut down your system by following the steps in
“Shutting Down the TSQ 9000 System”
.
2. Remove the four screws securing the left hand front panel to the chassis. One of the
screws is located on the interior front panel of the instrument.
Figure 457.
Locating the Left Hand Front Panel Screws
3. Lift the left hand front panel off the instrument.
4. Disconnect the power connections from the left hand sub panel.
Screws
Left Hand Front
Panel
Screw on Front
of Instrument
Содержание TSQ 9000
Страница 1: ...TSQ 9000 Mass Spectrometer Hardware Manual 1R120618 0003 Revision C December 2018 ...
Страница 8: ......
Страница 124: ...1 Performing Routine Maintenance Cleaning the Filters 96 TSQ 9000 Hardware Manual Thermo Scientific ...
Страница 476: ......