3
Advanced Troubleshooting
Replacing Components of the Manifold
274
TSQ 9000 Hardware Manual
Thermo Scientific
Vent Valve Knob and O-Ring
To replace the vent valve knob and o-ring
1. Shut down your system by following the steps in
“Shutting Down the TSQ 9000 System”
. You do not have to remove the ion source cartridge or column. If you are
using hydrogen as a carrier gas, power off the GC.
.
2. Remove and replace the vent valve knob and o-ring. Be careful not to pinch the o-ring
during installation.
3. Restart your system by following the instructions in
Note
See the
ISQ and TSQ GC-MS Spare Parts Guide
for information about ordering
these components.
Figure 296.
Powering Off the TSQ 9000 Instrument
Power Switch
Vacuum Interlock Shield
Vent Valve Knob
Top Cover Panel
Hydrogen Safety Screws
Содержание TSQ 9000
Страница 1: ...TSQ 9000 Mass Spectrometer Hardware Manual 1R120618 0003 Revision C December 2018 ...
Страница 8: ......
Страница 124: ...1 Performing Routine Maintenance Cleaning the Filters 96 TSQ 9000 Hardware Manual Thermo Scientific ...
Страница 476: ......