3
Advanced Troubleshooting
Replacing Components of the Analyzer
144
TSQ 9000 Hardware Manual
Thermo Scientific
6. Reattach the source interface board to the wall of the chassis.
7. Slide the heat shield back into its slot and reattach the bottom left screw. The heat shield
should be flush with the manifold side wall.
8. Reattach the filament board and wires.
9. Check all wires to ensure that none contact any metal surface and that there is sufficient
space left below the source block for the magnet yoke.
10. Align the manifold door with the ion source and screw it to the manifold.
Figure 111.
Reconnecting the Analyzer Tray from the Instrument
Source Interface
Board
Left
Screw
Filament Board
and Wires
Right
Screw
Calibration and
Reagent Gas
Tubes
Heat
Shield
CAUTION
Although the wires are insulated with glass braid, they may short through the
insulation if they touch a metal surface. Use caution when closing the door to ensure the
magnets to not come in contact with the source block or top of the filament. This might
cause them to be disengaged from the holder.
ATTENTION
Bien que les fils soient isolés à l’aide de fibre de verre, ils peuvent
court-circuiter à travers l’isolation s’ils entrent en contact avec une surface métallique. Soyez
prudent lorsque vous fermez la porte, afin de vous assurer que les aimants n’entrent pas en
contact avec le bloc source ou le dessus du filament. Cela peut les désengager du support.
Содержание TSQ 9000
Страница 1: ...TSQ 9000 Mass Spectrometer Hardware Manual 1R120618 0003 Revision C December 2018 ...
Страница 8: ......
Страница 124: ...1 Performing Routine Maintenance Cleaning the Filters 96 TSQ 9000 Hardware Manual Thermo Scientific ...
Страница 476: ......