3
Advanced Troubleshooting
Replacing the Calibration Gas Components
Thermo Scientific
TSQ 9000 Hardware Manual
381
16. Reattach the two screws holding the transfer line to the chassis. Position the analyzer tray
back on the transfer line.
17. Tighten the screw holding the analyzer tray to the transfer line.
18. Reconnect the electrical cable to the connector.
19. Reconnect the two compression nuts to the fittings on each side of the transfer line.
20. Close the front door of the manifold and reattach the four screws.
21. Slide the right side panel back onto the instrument and reattach the screws.
22. Reposition the TSQ 9000 instrument closer to the GC.
23. Reinsert the column to the proper length and tighten the transfer line nut. See
for more information.
24. Restart your system by following the instructions in
CAUTION - INSTRUMENT DAMAGE
The electrical wires fit in a groove in the transfer
line. Do not pinch these wires between the sheet metal and edges of the groove when
tightening the screws to mount the transfer line to prevent electrical shorts.
A
TTENTION DOMMAGES À L’INSTRUMENT
Les fils électriques passent dans un sillon dans
la ligne de transfert. Ne pincez pas ces fils entre la tôle et les bords du sillon lorsque vous
serrez les vis pour assembler la ligne de transfert, afin d’éviter les courts-circuits électriques.
Note
Check the alignment of the transfer line. If it is not seated properly, adjust its
position.
Tip
At this point, check that the ion source cartridge insertion and removal is smooth. If it
is not, adjust the position of the transfer line.
Содержание TSQ 9000
Страница 1: ...TSQ 9000 Mass Spectrometer Hardware Manual 1R120618 0003 Revision C December 2018 ...
Страница 8: ......
Страница 124: ...1 Performing Routine Maintenance Cleaning the Filters 96 TSQ 9000 Hardware Manual Thermo Scientific ...
Страница 476: ......