Getting Started
R&S
®
ZNB/ZNBT
71
User Manual 1173.9163.02 ─ 55
test ports. It is recommended that you preset the R&S
ZNB/ZNBT to start from a well-
defined instrument state.
DUT
1
2
VNA
1
2
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
1
18
19
20
21
22
23
24
17
DUT
1
2
VNA
1. Connect the DUT between test ports 1 and 2 of the network analyzer as shown
above.
2. Switch on the instrument and start the VNA application.
Proceed as described in
Chapter 4.1.7, "Starting the Analyzer and Shutting Down"
Performing Measurements