2 - 3
2. INSTALLATION
(2) 11k to 22kW
(a) Installation of one servo amplifier
Control box
40mm or more
Servo amplifier
10mm
or more
10mm
or more
120mm
or more
Control box
Wiring allowance
80mm
Top
Bottom
(b) Installation of two or more servo amplifiers
Leave a large clearance between the top of the servo amplifier and the internal surface of the control
box, and install a cooling fan to prevent the internal temperature of the control box from exceeding the
environmental conditions.
(3) Others
When using heat generating equipment such as the regenerative option, install them with full consideration
of heat generation so that the servo amplifier is not affected.
Install the servo amplifier on a perpendicular wall in the correct vertical direction.
Control box
100mm
or more
10mm or more
30mm
or more
120mm or more
30mm
or more
Top
Bottom
Содержание Melservo-J3 Series MR-J3-B
Страница 19: ...10 MEMO ...
Страница 55: ...1 36 1 FUNCTIONS AND CONFIGURATION MEMO ...
Страница 61: ...2 6 2 INSTALLATION MEMO ...
Страница 179: ...4 58 4 SIGNALS AND WIRING MEMO ...
Страница 241: ...5 62 5 OPERATION MEMO ...
Страница 357: ...10 16 10 SPECIAL ADJUSTMENT FUNCTIONS MEMO ...
Страница 385: ...11 28 11 TROUBLESHOOTING MEMO ...
Страница 397: ...12 12 12 OUTLINE DRAWINGS MEMO ...
Страница 755: ...17 70 17 SPEED CONTROL OPERATION MEMO ...
Страница 793: ...App 38 APPENDIX MEMO ...
Страница 799: ...MEMO ...