D • Front Panel Control
Doc. 065051-03 1/08
289
Reagent Prime after Concentrator Loading
NOTE
REAGENT PRIME
and
REAGENT FLUSH
are
included in the sample prep steps. However, they are
not performed until after the Load (concentrate)
step in the timed events (see
REAGENT PRIME
is used to prime the sampling needle assembly with
reagent after sample has been loaded onto a concentrator column. See
for details about concentrator injections. See
for details about the sampling needle assembly.
The following steps occur during reagent prime:
•
(Optional) The inject valve is switched to a specified position (load or
inject). For most applications, the valve position is not changed.
•
The needle arm moves to the waste port.
•
The prep syringe delivers the specified volume of reagent from the
reagent reservoir. This primes the sampling needle assembly with
reagent.
NOTE Although it is possible to select a vial or the flush
reservoir as the reagent source,
REAGENT PRIME
is
designed to be used only when a reagent reservoir is
the selected reagent source and the prep syringe is
installed.
10000 uL
Vlv
#1
N
RGNT_PRM
Reagent Source
Inject Valve Position
Volume to Prime
Volume
L (load)
I (inject)
N (no change)
100.0 to
50,000 L
(see notes)
μ
Source
Inject Valve
RES A, B, C, or D
(Requires sample
prep option)
Содержание As
Страница 1: ...AS Autosampler Operator s Manual Document No 065051 Revision 03 January 2008...
Страница 190: ...AS Autosampler Operator s Manual 178 Doc 065051 03 1 08...
Страница 238: ...AS Autosampler Operator s Manual 226 Doc 065051 03 1 08...
Страница 338: ...AS Autosampler Operator s Manual 326 Doc 065051 03 1 08...
Страница 355: ...Index Doc 065051 03 1 08 Index 17 Z Z address 255...
Страница 356: ...AS Autosampler Operator s Manual Index 18 Doc 065051 03 1 08...