AS Autosampler Operator’s Manual
170
Doc. 065051-03 1/08
5.16 Rebuilding the Injection or Diverter Valve
Rebuild the injection valve after about 2,100 cycles of use. Rebuild the diverter
valve after about 1,000 cycles of use. When the AS is operating under
Chromeleon control, a reminder message is displayed in the Audit Trail when the
number of cycles reaches this usage limit. If the AS is operating under front panel
control, the
USAGE LOG SCREEN
) displays the number of
cycles performed since the valve was last rebuilt.
1. Turn off the liquid flow.
2. Disconnect each liquid line connected to the injection valve (see
or diverter valve (see
Figure 5-36. Injection Valve Installed in the Autosampler Compartment
Figure 5-37. Diverter Valve Plumbing Connections
Disconnect
liquid lines (6)
Remove this
screw
Disconnect
liquid lines (3)
Содержание As
Страница 1: ...AS Autosampler Operator s Manual Document No 065051 Revision 03 January 2008...
Страница 190: ...AS Autosampler Operator s Manual 178 Doc 065051 03 1 08...
Страница 238: ...AS Autosampler Operator s Manual 226 Doc 065051 03 1 08...
Страница 338: ...AS Autosampler Operator s Manual 326 Doc 065051 03 1 08...
Страница 355: ...Index Doc 065051 03 1 08 Index 17 Z Z address 255...
Страница 356: ...AS Autosampler Operator s Manual Index 18 Doc 065051 03 1 08...