
xii
Table of Contents
NanoLockSpray source and ionization modes .......................................... 1-9
IntelliStart Fluidics system physical layout ................................................ 1-12
System operation ........................................................................................... 1-13
2 Preparing the Mass Spectrometer for Operation ........................... 2-1
Verifying the instrument’s state of readiness ................................................ 2-3
Monitoring the mass spectrometer LEDs....................................................... 2-3
Calibration ....................................................................................................... 2-3
Flow rates for the Xevo G2 QTof system ........................................................ 2-4
Preparing the IntelliStart Fluidics system ................................................. 2-4
Installing the reservoir bottles........................................................................ 2-4
Adjusting the solvent delivery tube positions ................................................ 2-7
Purging the pump ............................................................................................ 2-8
Leaving the mass spectrometer ready for operation ............................... 2-8
Emergency shutdown of the mass spectrometer ....................................... 2-9
3 Configuring the LockSpray Source ................................................... 3-1
Configuring the LockSpray source ............................................................... 3-2
Installing the ESI probe .................................................................................. 3-2
Removing the ESI probe.................................................................................. 3-6
Installing the small-bore capillary option .................................................. 3-7
Summary of Contents for Xevo G2 QTof
Page 10: ...x...
Page 18: ...xviii Table of Contents...
Page 34: ...1 16 Waters Xevo G2 QTof Overview...
Page 44: ...2 10 Preparing the Mass Spectrometer for Operation...
Page 227: ...Connecting the liquid waste line B 17 Positioning of drain tube TP01807 Correct Incorrect...
Page 238: ...B 28 External Connections...
Page 242: ...C 4 Materials of Construction and Compatible Solvents...
Page 248: ...Index 6...