
5-122 Maintenance Procedures
9. Connect port 2 of the diverter valve to the source probe, observing the
relevant procedure:
•
For the ESI probe, see
.
•
For the APCI probe, see
10. Close the access doors to the IntelliStart Fluidics system.
Caution:
Ensure that the tubing does not become trapped when
you close the access doors to the IntelliStart Fluidics system.
Summary of Contents for Xevo G2 QTof
Page 10: ...x...
Page 18: ...xviii Table of Contents...
Page 34: ...1 16 Waters Xevo G2 QTof Overview...
Page 44: ...2 10 Preparing the Mass Spectrometer for Operation...
Page 227: ...Connecting the liquid waste line B 17 Positioning of drain tube TP01807 Correct Incorrect...
Page 238: ...B 28 External Connections...
Page 242: ...C 4 Materials of Construction and Compatible Solvents...
Page 248: ...Index 6...