
Index-3
LEDs
maintenance procedures
preparing for working on the source
rebooting
source enclosure
removing
state of readiness, verifying
mass spectrometer shock hazard
materials of construction
mobile phases, solvents used in
preparation of
N
nanoACQUITY UPLC system
NanoLockSpray source
camera, connecting
nitrogen exhaust
line, connecting
trap bottle
trap bottle, emptying
nitrogen gas supply, connecting
O
oil, Varian roughing pump
adding
inspecting level of
oil-free roughing pump, replacing seals
opening source isolation valve
operating source isolation valve
O-ring removal kit
O-rings, removing
P
pin-plug capillary locator
plumbing, lock mass system
plumbing, sample system
power LED
preventing contamination
probes
APCI
cleaning tip
installing
removing
replacing capillary
replacing heater
ESI
installing
optimizing for ESCi
removing
replacing capillary
replacing tip
reference, replacing capillary
Q
quality control
R
rear panel connectors
rebooting
reference probe, replacing capillary
removing
APCI probe
corona pin
ESI probe
ion block assembly
O-rings
sampling cone assembly
seals
source enclosure
replacement parts
replacing
APCI probe capillary
APCI probe heater
corona pin
ESI probe capillary
ESI probe tip
Summary of Contents for Xevo G2 QTof
Page 10: ...x...
Page 18: ...xviii Table of Contents...
Page 34: ...1 16 Waters Xevo G2 QTof Overview...
Page 44: ...2 10 Preparing the Mass Spectrometer for Operation...
Page 227: ...Connecting the liquid waste line B 17 Positioning of drain tube TP01807 Correct Incorrect...
Page 238: ...B 28 External Connections...
Page 242: ...C 4 Materials of Construction and Compatible Solvents...
Page 248: ...Index 6...