
Table of Contents
xiii
Installing the APCI probe ............................................................................. 3-13
Removing the APCI probe ............................................................................. 3-17
Optimizing the ESI probe for ESCi operation.............................................. 3-18
4 Configuring the NanoLockSpray Source ......................................... 4-1
Overview of the NanoLockSpray source ..................................................... 4-2
Sample sprayer ................................................................................................ 4-3
Lock-spray sprayer .......................................................................................... 4-3
NanoFlow gas supply....................................................................................... 4-4
Purge gas.......................................................................................................... 4-4
Sprayer platform adjuster assembly............................................................... 4-4
Configuring the NanoLockSpray source ..................................................... 4-4
Advancing and retracting the sprayer platform ....................................... 4-6
Plumbing the backpressure gas ...................................................................... 4-9
Installing the glass capillary sprayer ........................................................... 4-10
Fitting and loading the glass capillary......................................................... 4-11
5 Maintenance Procedures ..................................................................... 5-1
Troubleshooting with Connections INSIGHT ............................................ 5-5
Preparing the instrument for working on the source ............................. 5-7
Summary of Contents for Xevo G2 QTof
Page 10: ...x...
Page 18: ...xviii Table of Contents...
Page 34: ...1 16 Waters Xevo G2 QTof Overview...
Page 44: ...2 10 Preparing the Mass Spectrometer for Operation...
Page 227: ...Connecting the liquid waste line B 17 Positioning of drain tube TP01807 Correct Incorrect...
Page 238: ...B 28 External Connections...
Page 242: ...C 4 Materials of Construction and Compatible Solvents...
Page 248: ...Index 6...