
Configuring for APCI mode
3-17
6. Close the access door to the IntelliStart Fluidics system.
7. Install the corona pin in the source (see
Removing the APCI probe
Required materials
Chemical-resistant, powder-free gloves
To remove the APCI probe:
1. Prepare the instrument for working on the source (see
2. Remove the corona pin from the source (see
3. Disconnect the diverter valve tubing from the APCI probe.
4. Unscrew the probe locking ring.
5. Carefully remove the probe from the probe adjuster assembly.
Caution:
Ensure that the tubing does not become trapped when
closing the access door to the IntelliStart Fluidics system.
Warning:
The LC system connections, APCI probe, and source can
be contaminated with biohazardous and/or toxic materials. Always
wear chemical-resistant, powder-free gloves while performing this
procedure.
Warning:
To avoid electric shock, ensure that the instrument is
prepared for working on the source before commencing this procedure.
Summary of Contents for Xevo G2 QTof
Page 10: ...x...
Page 18: ...xviii Table of Contents...
Page 34: ...1 16 Waters Xevo G2 QTof Overview...
Page 44: ...2 10 Preparing the Mass Spectrometer for Operation...
Page 227: ...Connecting the liquid waste line B 17 Positioning of drain tube TP01807 Correct Incorrect...
Page 238: ...B 28 External Connections...
Page 242: ...C 4 Materials of Construction and Compatible Solvents...
Page 248: ...Index 6...