
Replacing the reference probe capillary (LockSpray source)
5-83
To remove the existing capillary:
1. Prepare the instrument for working on the source (see
2. If an ESI probe is fitted to the source, remove it from the source (see
).
3. Pull the source enclosure release (located at the bottom, right-hand side)
outwards, and swing open the enclosure.
4. Wait 10 minutes for the source ion block to cool.
5. Use the extender tool to disconnect the SealTight nut on the inside of the
source enclosure.
6. Rotate the reference sprayer assembly clockwise through 90º, and
remove it from the reference sprayer support assembly.
7. Use the 4-mm wrench to unscrew and remove the reference probe tip
from the reference sprayer assembly.
Warning:
The probe and source can be hot. To avoid burn injuries,
take great care while working with these components.
Warning:
The ESI probe tip is sharp. To avoid puncture wounds, if
an ESI probe is fitted to the source, remove the probe before
continuing with this procedure.
Reference
sprayer
assembly
Reference
sprayer support
assembly
Summary of Contents for Xevo G2 QTof
Page 10: ...x...
Page 18: ...xviii Table of Contents...
Page 34: ...1 16 Waters Xevo G2 QTof Overview...
Page 44: ...2 10 Preparing the Mass Spectrometer for Operation...
Page 227: ...Connecting the liquid waste line B 17 Positioning of drain tube TP01807 Correct Incorrect...
Page 238: ...B 28 External Connections...
Page 242: ...C 4 Materials of Construction and Compatible Solvents...
Page 248: ...Index 6...