
xvi
Table of Contents
Replacing the LockSpray source’s assembly seals ................................. 5-98
Removing the probe adjuster assembly probe and source
Fitting the new source enclosure and probe adjuster assembly
Replacing the mass spectrometer’s air filters ........................................ 5-102
Replacing the air filter inside the front door.............................................. 5-102
Replacing the air filters on the sides of the instrument ............................ 5-104
Replacing the IntelliStart Fluidics tubing ............................................. 5-106
Removing the IntelliStart Fluidics tubing ................................................. 5-107
Plumbing the IntelliStart Fluidics lock-spray system............................... 5-108
Plumbing the IntelliStart Fluidics sample delivery system...................... 5-116
Task-specific hazard warnings........................................................................ A-2
Specific warnings ............................................................................................. A-3
Warnings that apply to all Waters instruments ......................................... A-6
Electrical symbols .......................................................................................... A-11
Handling symbols .......................................................................................... A-12
Mass spectrometer external wiring and vacuum connections ............. B-2
Connecting the Varian oil-filled roughing pump ..................................... B-3
Making the electrical connections to the Varian oil-filled
Connecting the Edwards oil-free roughing pump ................................... B-7
Making the electrical connections to the Edwards oil-free
Connecting to the nitrogen gas supply ..................................................... B-10
Summary of Contents for Xevo G2 QTof
Page 10: ...x...
Page 18: ...xviii Table of Contents...
Page 34: ...1 16 Waters Xevo G2 QTof Overview...
Page 44: ...2 10 Preparing the Mass Spectrometer for Operation...
Page 227: ...Connecting the liquid waste line B 17 Positioning of drain tube TP01807 Correct Incorrect...
Page 238: ...B 28 External Connections...
Page 242: ...C 4 Materials of Construction and Compatible Solvents...
Page 248: ...Index 6...