
5-8
Maintenance Procedures
To remove the source enclosure:
1. Prepare the instrument for working on the source (see
2. Remove the probe from the source:
•
If you are removing an ESI probe, see
.
•
If you are removing an APCI probe, see
3. Slide open the instrument’s source interface door (see the figure on
).
4. Disconnect the probe adjuster and options cables from the instrument’s
connectors.
5. Pull the source enclosure release (located at the bottom, right-hand side)
outwards, and swing open the enclosure.
Warning:
The source components can be contaminated with
biohazardous and/or toxic materials. Always wear
chemical-resistant, powder-free gloves while performing this
procedure.
Warning:
The probe and source can be hot. To avoid burn injuries,
take great care while working with these components.
Warning:
The corona pin tip is sharp. To avoid puncture wounds,
take great care while working with the source enclosure open if a
corona pin is fitted.
Caution:
If you are removing a NanoLockSpray source enclosure,
to avoid damage to the sample inlet, you must move the sprayer
platform out of the source enclosure before you open the source
enclosure (see
).
Summary of Contents for Xevo G2 QTof
Page 10: ...x...
Page 18: ...xviii Table of Contents...
Page 34: ...1 16 Waters Xevo G2 QTof Overview...
Page 44: ...2 10 Preparing the Mass Spectrometer for Operation...
Page 227: ...Connecting the liquid waste line B 17 Positioning of drain tube TP01807 Correct Incorrect...
Page 238: ...B 28 External Connections...
Page 242: ...C 4 Materials of Construction and Compatible Solvents...
Page 248: ...Index 6...