
Cleaning the extraction cone
5-39
3. Remove the source enclosure (see
Rationale:
Removing the source enclosure aids access to the ion block
assembly.
4. Use the combined 2.5-mm Allen wrench and cone extraction tool to
unscrew the 4 captive ion block assembly securing screws.
Warning:
The source can be hot. To avoid burn injuries, allow it to
cool for at least 30 minutes before proceeding.
Warning:
To avoid puncture wounds, take great care while
working with the source enclosure open if one or both of these
conditions apply:
• An ESI probe is fitted (the probe tip is sharp).
• A corona pin is fitted (the pin tip is sharp).
TP03130
Ion block assembly
securing screws
Combined
2.5-mm Allen
wrench and cone
extraction tool
Summary of Contents for Xevo G2 QTof
Page 10: ...x...
Page 18: ...xviii Table of Contents...
Page 34: ...1 16 Waters Xevo G2 QTof Overview...
Page 44: ...2 10 Preparing the Mass Spectrometer for Operation...
Page 227: ...Connecting the liquid waste line B 17 Positioning of drain tube TP01807 Correct Incorrect...
Page 238: ...B 28 External Connections...
Page 242: ...C 4 Materials of Construction and Compatible Solvents...
Page 248: ...Index 6...