
B-24 External Connections
To make signal connections:
1. Determine the signal connection location from the silk-screened label on
the rear panel of each instrument.
2. Attach the positive and negative leads of the signal cable to the
connector.
3. Slide the clamp (with the bend facing down) into the protective shield.
4. Insert the clamp and shield (with the bend facing down) into the
connection cover, and loosely tighten with one self-tapping screw.
TP02585
Signal cable
Connector
TP02586
Connection cover
Shield
Clamp
Summary of Contents for Xevo G2 QTof
Page 10: ...x...
Page 18: ...xviii Table of Contents...
Page 34: ...1 16 Waters Xevo G2 QTof Overview...
Page 44: ...2 10 Preparing the Mass Spectrometer for Operation...
Page 227: ...Connecting the liquid waste line B 17 Positioning of drain tube TP01807 Correct Incorrect...
Page 238: ...B 28 External Connections...
Page 242: ...C 4 Materials of Construction and Compatible Solvents...
Page 248: ...Index 6...