
5-1
5
Maintenance Procedures
This chapter provides the maintenance guidelines and procedures
necessary to maintain the instrument’s performance.
Keep to a maintenance schedule, and perform maintenance as required
and described in this chapter.
Contents:
Topic
Page
Troubleshooting with Connections INSIGHT
Preparing the instrument for working on the source
Removal and refitting of the source enclosure
Installing and removing the corona pin
Operating the source isolation valve
Emptying the nitrogen exhaust trap bottle
Inspecting the Varian roughing pump oil level
Adding oil to the Varian roughing pump
Replacing the Varian roughing pump’s oil and oil mist filter
Cleaning the source components
Cleaning the sampling cone assembly
Cleaning the ion block assembly
Cleaning the source hexapole assembly
Summary of Contents for Xevo G2 QTof
Page 10: ...x...
Page 18: ...xviii Table of Contents...
Page 34: ...1 16 Waters Xevo G2 QTof Overview...
Page 44: ...2 10 Preparing the Mass Spectrometer for Operation...
Page 227: ...Connecting the liquid waste line B 17 Positioning of drain tube TP01807 Correct Incorrect...
Page 238: ...B 28 External Connections...
Page 242: ...C 4 Materials of Construction and Compatible Solvents...
Page 248: ...Index 6...