
5-2
Maintenance Procedures
Replacing the ESI probe sample capillary
Replacing the APCI probe sample capillary
Replacing the reference probe capillary (LockSpray source)
Replacing the reference probe capillary (NanoLockSpray
Cleaning or replacing the corona pin
Replacing the APCI probe heater
Replacing the ion block source heater
Replacing the LockSpray source’s assembly seals
Replacing the mass spectrometer’s air filters
Replacing the IntelliStart Fluidics tubing
Contents: (Continued)
Topic
Page
Summary of Contents for Xevo G2 QTof
Page 10: ...x...
Page 18: ...xviii Table of Contents...
Page 34: ...1 16 Waters Xevo G2 QTof Overview...
Page 44: ...2 10 Preparing the Mass Spectrometer for Operation...
Page 227: ...Connecting the liquid waste line B 17 Positioning of drain tube TP01807 Correct Incorrect...
Page 238: ...B 28 External Connections...
Page 242: ...C 4 Materials of Construction and Compatible Solvents...
Page 248: ...Index 6...