
5-106 Maintenance Procedures
Replacing the IntelliStart Fluidics tubing
You must replace the tubing between the components of the IntelliStart
Fluidics system when the tubing or its connections become blocked. The
following procedures explain how to replace the tubing for the lock-spray and
sample delivery systems. They do not, however, address probe connections,
which vary according to your application. For probe connection instructions,
see the relevant procedure:
•
For the ESI probe, see
•
For the APCI probe, see
.
IntelliStart Fluidics system physical layout:
(Connections omitted for clarity.)
A
B
C
A
A
B
B
C
A
A
B
B
C
W aters
W aters
AA
BB
CC
Lock-spray selector valve
Sample pump
Lock-spray pump
Sample reservoir
bottles (A, B, and C)
Tubing guides
Flow sensor
Access doors
Sample
selector
valve
Diverter
valve
Grounded union
Summary of Contents for Xevo G2 QTof
Page 10: ...x...
Page 18: ...xviii Table of Contents...
Page 34: ...1 16 Waters Xevo G2 QTof Overview...
Page 44: ...2 10 Preparing the Mass Spectrometer for Operation...
Page 227: ...Connecting the liquid waste line B 17 Positioning of drain tube TP01807 Correct Incorrect...
Page 238: ...B 28 External Connections...
Page 242: ...C 4 Materials of Construction and Compatible Solvents...
Page 248: ...Index 6...