
5-118 Maintenance Procedures
a. Slide the PEEK nut, stainless steel ring, and Super Flangeless
ferrule over the pump end of the steel tubing.
b. Insert the tubing in the pump, and tighten the fittings.
c.
At the sample selector valve, screw the natural-color PEEK
female-to-male adaptor into port 7.
d. Slide the transparent, 1/16-inch flangeless nut and blue, 1/16-inch
flangeless ferrule over the tubing.
Rationale:
These components provide fail-safe pressure relief in
case of a blockage.
e. Insert the tubing in the female-to-male adaptor in port 7, and
tighten the fittings.
Super Flangeless ferrule
Stainless steel ring
PEEK nut
Stainless steel tubing
PEEK female-to-male
adaptor
Flangeless ferrule
Flangeless nut
Summary of Contents for Xevo G2 QTof
Page 10: ...x...
Page 18: ...xviii Table of Contents...
Page 34: ...1 16 Waters Xevo G2 QTof Overview...
Page 44: ...2 10 Preparing the Mass Spectrometer for Operation...
Page 227: ...Connecting the liquid waste line B 17 Positioning of drain tube TP01807 Correct Incorrect...
Page 238: ...B 28 External Connections...
Page 242: ...C 4 Materials of Construction and Compatible Solvents...
Page 248: ...Index 6...