
Replacing the IntelliStart Fluidics tubing 5-121
7. Using two long “finger-tight” fittings, connect the red, 1/16-inch,
200-mm, PEEK tubing from port 3 of the sample selector valve to port 3
of the diverter valve.
8. Using a long “finger-tight” fitting, connect 1/16-inch, 1000-mm,
natural-colored PEEK tubing to port 4 of the diverter valve, and thread
it securely into the waste port.
Tip:
This is the same waste port as used in
A
B
C
A
B
C
A
B
C
Waters
A
B
C
Diverter valve
A
B
C
A
B
C
A
B
C
Waters
A
B
C
Waste port
Summary of Contents for Xevo G2 QTof
Page 10: ...x...
Page 18: ...xviii Table of Contents...
Page 34: ...1 16 Waters Xevo G2 QTof Overview...
Page 44: ...2 10 Preparing the Mass Spectrometer for Operation...
Page 227: ...Connecting the liquid waste line B 17 Positioning of drain tube TP01807 Correct Incorrect...
Page 238: ...B 28 External Connections...
Page 242: ...C 4 Materials of Construction and Compatible Solvents...
Page 248: ...Index 6...