
Preparing the IntelliStart Fluidics system
2-5
To install the reservoir bottles:
1. Remove the reservoir bottle caps.
2. Screw the reservoir bottles onto the mass spectrometer, as shown below.
3. For each reservoir bottle, ensure that the ends of the solvent delivery
tubes are positioned so that they are close to, but do not touch, the
bottom of the bottle (see
).
Warning:
The reservoir bottles can be contaminated with
biohazardous and/or toxic materials. Always wear
chemical-resistant, powder-free gloves while performing this
procedure.
Reservoir bottle
Solvent delivery tube
Summary of Contents for Xevo G2 QTof
Page 10: ...x...
Page 18: ...xviii Table of Contents...
Page 34: ...1 16 Waters Xevo G2 QTof Overview...
Page 44: ...2 10 Preparing the Mass Spectrometer for Operation...
Page 227: ...Connecting the liquid waste line B 17 Positioning of drain tube TP01807 Correct Incorrect...
Page 238: ...B 28 External Connections...
Page 242: ...C 4 Materials of Construction and Compatible Solvents...
Page 248: ...Index 6...