
Cleaning the ion block assembly
5-47
3. Grasp the cone gas nozzle handle and use it to rotate the sampling cone
assembly through 90 degrees.
4. Slide the sampling cone assembly out of the ion block assembly.
5. Use the combined 2.5-mm Allen wrench and cone extraction tool to
loosen the 2 ion block cover plate captive securing screws.
6. Remove the ion block cover plate.
Caution:
To ensure correct operation of the ion block assembly
after reassembly,
• do not remove the sampling cone assembly retaining blocks.
• do not adjust the screws securing the sampling cone assembly
retaining blocks.
Ion block cover plate securing screw
Ion block cover plate
Summary of Contents for Xevo G2 QTof
Page 10: ...x...
Page 18: ...xviii Table of Contents...
Page 34: ...1 16 Waters Xevo G2 QTof Overview...
Page 44: ...2 10 Preparing the Mass Spectrometer for Operation...
Page 227: ...Connecting the liquid waste line B 17 Positioning of drain tube TP01807 Correct Incorrect...
Page 238: ...B 28 External Connections...
Page 242: ...C 4 Materials of Construction and Compatible Solvents...
Page 248: ...Index 6...