
Replacing the APCI probe sample capillary
5-81
18. Use the combined 2.5-mm Allen wrench and cone extraction tool to fit
and tighten the 3 end-cover securing screws.
19. Fit the probe heater (see
).
20. Fit the probe to the instrument (see
).
21. In the Instrument Console, click API
to start the probe and
desolvation gas flows.
Caution:
• When handling the probe heater, take great care to grip the
heater so as not to damage its electrical wiring.
• Take great care not to damage the probe heater’s electrical
connections, capillary sleeve, or capillary when fitting the
heater over the capillary sleeve.
Summary of Contents for Xevo G2 QTof
Page 10: ...x...
Page 18: ...xviii Table of Contents...
Page 34: ...1 16 Waters Xevo G2 QTof Overview...
Page 44: ...2 10 Preparing the Mass Spectrometer for Operation...
Page 227: ...Connecting the liquid waste line B 17 Positioning of drain tube TP01807 Correct Incorrect...
Page 238: ...B 28 External Connections...
Page 242: ...C 4 Materials of Construction and Compatible Solvents...
Page 248: ...Index 6...