
B-2
External Connections
Mass spectrometer external wiring and vacuum
connections
The instrument’s rear panel connectors are shown below.
Mass spectrometer rear panel connectors:
Caution:
The two switches above the roughing pump connector are for
use by Waters service engineers only; they must be kept in the “up”
position at all times.
External Connections 2
10
1
External Connections 1
10
1
System Activity
200 - 240V, 50/60Hz, 1.1kW
Video Output
Service Bus
Instrument LAN
1
2
3
4
5
6
7
8
9
10
+
-
Event In 1
External Connections 1
Not used
CE
Interlock
OUT
+
-
Event In 2
Not used
-
IN
IN
Com
N/C
N/O
Com
N/C
N/O
1
2
3
4
5
6
7
8
9
10
+
-
Analogue
Out
External Connections 2
OUT
Gas Fail
Interlock
Not used
-
OUT
OUT
+
-
Event Out 1
+
-
Event Out 2
OUT
-
EPC Com Port
EPC Parallel Port
Event inputs
and outputs
Shielded Ethernet
Roughing pump / delayed roughing pump
Vacuum
port
Power
Nitrogen exhaust
Nitrogen inlet
Collision cell gas inlet
Pilot valve port
Video output
Summary of Contents for Xevo G2 QTof
Page 10: ...x...
Page 18: ...xviii Table of Contents...
Page 34: ...1 16 Waters Xevo G2 QTof Overview...
Page 44: ...2 10 Preparing the Mass Spectrometer for Operation...
Page 227: ...Connecting the liquid waste line B 17 Positioning of drain tube TP01807 Correct Incorrect...
Page 238: ...B 28 External Connections...
Page 242: ...C 4 Materials of Construction and Compatible Solvents...
Page 248: ...Index 6...