
3-14
Configuring the LockSpray Source
To install the APCI probe:
1. Prepare the instrument for working on the source (see
2. With the probe label facing you, carefully slide the APCI probe into the
hole in the probe adjuster assembly, ensuring that the probe location
dowel aligns with the location hole in the probe adjuster assembly.
Warning:
The LC system connections, APCI probe, and source can
be contaminated with biohazardous and/or toxic materials. Always
wear chemical-resistant, powder-free gloves while performing this
procedure.
Warning:
To avoid electric shock, ensure that the instrument is
prepared for working on the source before commencing this procedure.
TP03129
APCI probe location dowel
Location hole in the probe
adjuster assembly
Probe label
Summary of Contents for Xevo G2 QTof
Page 10: ...x...
Page 18: ...xviii Table of Contents...
Page 34: ...1 16 Waters Xevo G2 QTof Overview...
Page 44: ...2 10 Preparing the Mass Spectrometer for Operation...
Page 227: ...Connecting the liquid waste line B 17 Positioning of drain tube TP01807 Correct Incorrect...
Page 238: ...B 28 External Connections...
Page 242: ...C 4 Materials of Construction and Compatible Solvents...
Page 248: ...Index 6...