
B-1
B
External Connections
This appendix describes the mass spectrometer’s external connections.
Warning:
The mass spectrometer is heavy. To avoid injury, use
suitable machinery and the supplied harness to lift it.
Caution:
• Contact Waters Technical Service before moving the
instrument.
• If you must transport the mass spectrometer, or remove it from
service, contact Waters Technical Service for recommended
cleaning, flushing, and packaging procedures.
Contents:
Topic
Page
Mass spectrometer external wiring and vacuum connections
Connecting the Varian oil-filled roughing pump
Connecting the Edwards oil-free roughing pump
Connecting to the nitrogen gas supply
Connecting to the collision cell gas supply
Connecting the nitrogen exhaust line
Connecting the liquid waste line
Connecting the workstation (systems with no ACQUITY LC) B-19
Connecting Ethernet cables (systems with ACQUITY LC)
Input/output signal connectors
Connecting to the electricity source
Summary of Contents for Xevo G2 QTof
Page 10: ...x...
Page 18: ...xviii Table of Contents...
Page 34: ...1 16 Waters Xevo G2 QTof Overview...
Page 44: ...2 10 Preparing the Mass Spectrometer for Operation...
Page 227: ...Connecting the liquid waste line B 17 Positioning of drain tube TP01807 Correct Incorrect...
Page 238: ...B 28 External Connections...
Page 242: ...C 4 Materials of Construction and Compatible Solvents...
Page 248: ...Index 6...