
Emergency shutdown of the mass spectrometer
2-9
Emergency shutdown of the mass spectrometer
To shut down the mass spectrometer in an emergency:
1. Switch off the power at the electrical outlet.
Result:
The instrument turns off and vents.
2. Disconnect the power cable from the instrument’s rear panel.
Warning:
To isolate the instrument from the electrical supply,
disconnect the power cable from the instrument’s rear panel.
Caution:
Data can be lost during an emergency shutdown.
Summary of Contents for Xevo G2 QTof
Page 10: ...x...
Page 18: ...xviii Table of Contents...
Page 34: ...1 16 Waters Xevo G2 QTof Overview...
Page 44: ...2 10 Preparing the Mass Spectrometer for Operation...
Page 227: ...Connecting the liquid waste line B 17 Positioning of drain tube TP01807 Correct Incorrect...
Page 238: ...B 28 External Connections...
Page 242: ...C 4 Materials of Construction and Compatible Solvents...
Page 248: ...Index 6...