
2-1
2
Preparing the Mass
Spectrometer for Operation
This chapter explains how to start up and shut down the mass
spectrometer.
Contents:
Topic
Page
Starting the mass spectrometer
Preparing the IntelliStart Fluidics system
Rebooting the mass spectrometer
Leaving the mass spectrometer ready for operation
Summary of Contents for Xevo G2 QTof
Page 10: ...x...
Page 18: ...xviii Table of Contents...
Page 34: ...1 16 Waters Xevo G2 QTof Overview...
Page 44: ...2 10 Preparing the Mass Spectrometer for Operation...
Page 227: ...Connecting the liquid waste line B 17 Positioning of drain tube TP01807 Correct Incorrect...
Page 238: ...B 28 External Connections...
Page 242: ...C 4 Materials of Construction and Compatible Solvents...
Page 248: ...Index 6...