
2-4
Preparing the Mass Spectrometer for Operation
Flow rates for the Xevo G2 QTof system
The Xevo G2 QTof system can run at high flow rates. To optimize desolvation,
and thus sensitivity, run the system at appropriate gas flows and desolvation
temperatures.
Preparing the IntelliStart Fluidics system
For additional information, see
“Connecting the liquid waste line” on
Installing the reservoir bottles
Use standard reservoir bottles (30-mL) for instrument setup and calibration.
Use the Low-volume Adaptor Kit (included) to infuse smaller volumes. The
low-volume vials have a volume of 1.5 mL.
Required materials
Chemical-resistant, powder-free gloves
Flow rate versus temperature and gas flow:
Flow rate
(mL/min)
Source
temperature (°C)
Desolvation
temperature (°C)
Desolvation gas
flow (L/h)
0.000 to 0.020
100
200
800
0.020 to 0.100
120
350
800
0.101 to 0.300
120
450
800
0.301 to 0.500
150
500
1000
>0.500
150
0
1200
Warning:
To avoid injuries from broken glass, falling objects, or
exposure to toxic substances, never place containers on top of the
instrument or on its front covers.
Summary of Contents for Xevo G2 QTof
Page 10: ...x...
Page 18: ...xviii Table of Contents...
Page 34: ...1 16 Waters Xevo G2 QTof Overview...
Page 44: ...2 10 Preparing the Mass Spectrometer for Operation...
Page 227: ...Connecting the liquid waste line B 17 Positioning of drain tube TP01807 Correct Incorrect...
Page 238: ...B 28 External Connections...
Page 242: ...C 4 Materials of Construction and Compatible Solvents...
Page 248: ...Index 6...