e-STUDIO200L/202L/230/232/280/282 ADJUSTMENT
June 2004 © TOSHIBA TEC
3 - 50
3.9
Adjustment of Developer Unit
3.9.1
Doctor-to-sleeve gap
Adjustment tool to use: Doctor-sleeve jig
<Procedure>
(1)
Perform the adjustment code “05-280”.
(2)
Take out the process unit from the equipment.
(3)
Take out the developer unit from the process unit.
(4)
Remove 2 screws and take off the developer
material cover and discharge the developer
material.
Note:
Note:
Discharge the developer material from the
rear side, being careful not to let it be scat-
tered on the gear.
Fig.3-44
(5)
Turn the adjustment screw to widen the gap
so that the jig can be inserted in it.
(Turning the screw clockwise widens the
gap)
Fig.3-45
Developer
material cover
Screw
Summary of Contents for e-STUDIO200L
Page 6: ......
Page 12: ......
Page 400: ...e STUDIO200L 202L 230 232 280 282 ADJUSTMENT June 2004 TOSHIBA TEC 3 104 ...
Page 554: ...e STUDIO200L 202L 230 232 280 282 TROUBLESHOOTING June 2004 TOSHIBA TEC 5 124 ...
Page 678: ...e STUDIO200L 202L 230 232 280 282 REMOTE SERVICE June 2004 TOSHIBA TEC 8 24 ...
Page 702: ...e STUDIO200L 202L 230 232 280 282 WIRE HARNESS CONNECTION DIAGRAMS June 2004 TOSHIBA TEC 10 2 ...
Page 707: ......
Page 708: ......