e-STUDIO200L/202L/230/232/280/282 ADJUSTMENT
June 2004 © TOSHIBA TEC
3 - 34
[A]
Installation of the high-voltage transformer jig
(1)
Open the bypass tray, ADU and transfer
cover.
(2)
Open the front cover and take off the toner
cartridge.
(3)
Disconnect 1 connector. Loosen 2 screws
and pull out the process unit.
Note:
Note:
Be careful not to let the connector and the
harness be caught when installing the pro-
cess unit after adjustment.
Fig.3-19
(4)
Install the high-voltage transformer jig and fix
it with 2 screws.
Note:
Note:
Be careful not to let the connector and the
harness be caught.
Fig.3-20
(5)
Fix the green cable of the high-voltage trans-
former jig to the frame of the equipment.
Fig.3-21
Process unit
Connector
High-voltage transformer jig
Screw
Green cable
04/09
Summary of Contents for e-STUDIO200L
Page 6: ......
Page 12: ......
Page 400: ...e STUDIO200L 202L 230 232 280 282 ADJUSTMENT June 2004 TOSHIBA TEC 3 104 ...
Page 554: ...e STUDIO200L 202L 230 232 280 282 TROUBLESHOOTING June 2004 TOSHIBA TEC 5 124 ...
Page 678: ...e STUDIO200L 202L 230 232 280 282 REMOTE SERVICE June 2004 TOSHIBA TEC 8 24 ...
Page 702: ...e STUDIO200L 202L 230 232 280 282 WIRE HARNESS CONNECTION DIAGRAMS June 2004 TOSHIBA TEC 10 2 ...
Page 707: ......
Page 708: ......