June 2004 © TOSHIBA TEC
e-STUDIO200L/202L/230/232/280/282 PREVENTIVE MAINTENANCE (PM)
4 - 7
4
4.2
General Descriptions for PM Procedure
Perform the preventive maintenance in the following timing.
e-STUDIO200L/202L: every 6,400 sheets
e-STUDIO230/232: every 74,000 sheets
e-STUDIO280/282: every 90,000 sheets
(1)
Preparation
•
Ask the user about the current conditions of the equipment and note them down.
•
Before starting maintenance, make some sample copies and store them.
•
See the replacement record and check the parts to be replaced in the PM support mode (6S-
2) or list printing mode (9S-103).
6S-2
: [6] + [START] + [POWER] ON
[2]
[START]
9S-103
: [9] + [START] + [POWER] ON
[103]
[START]
Fig. 4-5
•
Turn OFF the power and make sure to unplug the equipment.
(2)
Perform a preventive maintenance using the following checklist and illustrations. Refer to the
Service Manual if necessary.
(3)
Plug in the equipment after the maintenance has been finished. Then turn ON the power and
make some copies to confirm that the equipment is working properly.
PM SUPPORT CODE LIST
MM-DD-YY 09:30
UNIT
OUTPUT PAGES
PM OUTPUT PAGE
DRIVE COUNTS
PM DRIVE COUNTS
DRUM
81813
150000
119758
220000
DRUM BLADE
81813
150000
119758
220000
GRID
81813
150000
119758
220000
MAIN CHARGER WIRE
81813
150000
119758
220000
SEPARATION FINGER (DRUM)
81813
150000
119758
220000
05/11
Summary of Contents for e-STUDIO200L
Page 6: ......
Page 12: ......
Page 400: ...e STUDIO200L 202L 230 232 280 282 ADJUSTMENT June 2004 TOSHIBA TEC 3 104 ...
Page 554: ...e STUDIO200L 202L 230 232 280 282 TROUBLESHOOTING June 2004 TOSHIBA TEC 5 124 ...
Page 678: ...e STUDIO200L 202L 230 232 280 282 REMOTE SERVICE June 2004 TOSHIBA TEC 8 24 ...
Page 702: ...e STUDIO200L 202L 230 232 280 282 WIRE HARNESS CONNECTION DIAGRAMS June 2004 TOSHIBA TEC 10 2 ...
Page 707: ......
Page 708: ......