e-STUDIO200L/202L/230/232/280/282 PREVENTIVE MAINTENANCE (PM)
June 2004 © TOSHIBA TEC
4 - 8
4.3
Operational Items in Overhauling
Overhaul each equipment with the following timing.
e-STUDIO200L/202L:
When the number of output pages has reached 193,000 or 2.5 years have
passed from the start of use (Whichever is earlier)
e-STUDIO230/232:
When the number of output pages has reached 222,000 or 2.5 years have
passed from the start of use (Whichever is earlier)
e-STUDIO280/282:
When the number of output pages has reached 270,000 or 2.5 years have
passed from the start of use (Whichever is earlier)
(1)
Replace all the supplies.
(2)
Check the components in the drive section (gears, pulleys, timing belts, etc.). Replace them with
new ones if they are damaged.
(3)
Check all the adhesives such as tape and Mylar if they are damaged or have become unstuck.
Replace them with new ones if necessary.
(4)
Check the performance of all the switches and sensors. Replace them with new ones if neces-
sary.
(5)
Clean inside the equipment thoroughly.
05/11
Summary of Contents for e-STUDIO200L
Page 6: ......
Page 12: ......
Page 400: ...e STUDIO200L 202L 230 232 280 282 ADJUSTMENT June 2004 TOSHIBA TEC 3 104 ...
Page 554: ...e STUDIO200L 202L 230 232 280 282 TROUBLESHOOTING June 2004 TOSHIBA TEC 5 124 ...
Page 678: ...e STUDIO200L 202L 230 232 280 282 REMOTE SERVICE June 2004 TOSHIBA TEC 8 24 ...
Page 702: ...e STUDIO200L 202L 230 232 280 282 WIRE HARNESS CONNECTION DIAGRAMS June 2004 TOSHIBA TEC 10 2 ...
Page 707: ......
Page 708: ......