June 2004 © TOSHIBA TEC
e-STUDIO200L/202L/230/232/280/282 TROUBLESHOOTING
5 - 65
5
[Procedure 2]
Is the staple/fold motor clock sensor (PI14) working properly?
#
NO
Replace the sensor.
YES
Does the staple/fold motor operate at the appropriate timing?
#
YES
Replace the finisher controller PC board.
NO
Is the stapler unit drive mechanism working properly?
#
NO
Fix the mechanism.
YES
Try replacing the staple/fold motor (M7). Is the problem corrected?
#
YES
End.
NO
Replace the finisher controller PC board.
[Procedure 3]
Is the folding home position sensor (PI11) working properly?
#
NO
Replace the sensor.
YES
Is the wiring between the finisher controller PC board and the staple/fold motor normal?
#
NO
Correct the wiring.
YES
Try to rotate the fold jam releasing dial. Is there mechanical trapping?
#
YES
Fix the mechanism.
NO
Try replacing the staple/fold motor (M7). Is the problem corrected?
#
YES
End.
NO
Replace the finisher controller PC board.
Summary of Contents for e-STUDIO200L
Page 6: ......
Page 12: ......
Page 400: ...e STUDIO200L 202L 230 232 280 282 ADJUSTMENT June 2004 TOSHIBA TEC 3 104 ...
Page 554: ...e STUDIO200L 202L 230 232 280 282 TROUBLESHOOTING June 2004 TOSHIBA TEC 5 124 ...
Page 678: ...e STUDIO200L 202L 230 232 280 282 REMOTE SERVICE June 2004 TOSHIBA TEC 8 24 ...
Page 702: ...e STUDIO200L 202L 230 232 280 282 WIRE HARNESS CONNECTION DIAGRAMS June 2004 TOSHIBA TEC 10 2 ...
Page 707: ......
Page 708: ......