1
Performing Routine Maintenance
Replacing a Column
26
TSQ 9000 Hardware Manual
Thermo Scientific
Figure 24.
Transfer Line Nut and Graphite Vespel Ferrule Orientation
Figure 25.
Transfer Line Nut and SilTite Ferrule Orientation
20. Insert the new column through the MS transfer line.
21. Carefully extend the column out the front to allow application of the nut and ferrule.
22. Insert the column through the nut and ferrule (flat side of the nut faces the MS).
23. Use a scoring wafer to score and then remove the last 10 mm of column to provide a
clean, well-cut end.
24. Wipe the column with an alcohol soaked-wipe after inserting through the ferrule.
25. Carefully push the column back into the GC transfer line while keeping the nut and
ferrule on the column.
Spring Loaded Transfer
Line Nut
Ferrule
Flat on the
Transferline Nut
Transfer Line Nut
SilTite Ferrule
Flat on the
Transferline Nut
Summary of Contents for TSQ 9000
Page 1: ...TSQ 9000 Mass Spectrometer Hardware Manual 1R120618 0003 Revision C December 2018 ...
Page 8: ......
Page 476: ......