Performing Routine Maintenance
Replacing a Column
Thermo Scientific
TSQ 9000 Hardware Manual
15
Figure 9.
Lining Up the Column in the Column Measuring Tool
14. Place a septum with a notch cut into it behind the transfer line nut. The septum marks
the place on the column where it should exit the nut.
Figure 10.
Positioning the Septum
15. Pull the column back from the spring loaded transfer line nut. Do not move the septum
from its position on the column.
Figure 11.
Pulling the Column Back from the Spring Loaded Transfer Line Nut
Column Outlet
Spring Loaded
Transfer Line Nut
Septum
Column
Measuring Tool