1
Installation
Coupling to a Mass Spectrometer
Thermo Scientific
TRACE 1300 and TRACE 1310 Hardware Manual
27
d. Remove the panel by pulling it outward. Be aware that the ground wire is attached to
the panel.
2. Prepare the duct for the TSQ Quantum transfer line inner tube.
a.
Use a T20 Torxhead screwdriver to loosen the duct plate screws from the GC right
panel of the MS. See
Figure 33.
Right Panel for MS
b. On the exterior wall of the oven box, remove the pre-shaped plug of insulating
material from the duct provided. See
Figure 34.
Pre-shaped Plug Removal
c.
On the interior of the oven box remove the partial cut plate from the corresponding
duct. See
Duct Plate
Duct for TSQ Quantum Pre-shaped Plug
IMPORTANT
Save the pre-shaped plug of insulating material in a safe place because it
could be reused.