8
Installing Optional Kits
Installing the NoVent Microfluidics
Thermo Scientific
TRACE 1300 and TRACE 1310 Hardware Manual
391
Figure 397.
Correct Orientation of Columns to Microfluidics Splitter
4. Close the GC door.
5. Close the vent valve knob.
6. Power on the mass spectrometer.
7. Ensure the switch is set to
Off
on the NoVent microfluidics module.
8. Let the mass spectrometer pump down for a minimum of one hour and then check the
air-water spectrum for gross leaks. Assuming the convection gauge and ion gauge (if
present) indicate appropriate pressures, small leaks can be located by spraying with Freon,
argon, or another suitable gas near the tubing connections.
Configuring the Post-Column
After installing the NoVent microfluidics, you must enter the post-column length and ID
before running samples. This section contains instructions for configuring your post-column
settings on both a TRACE 1310 and a TRACE 1300.
To enter post-column settings on a TRACE 1310
1. On the home page of the TRACE 1310 touchscreen, click the
Configuration
icon.
Capillary Restrictor to No-Vent Module
GC Column
Capillary Restrictor to Transfer Line