9
Adding Modules
Adding a FID, TCD/TCD In-Series, ECD, or FPD Detector Module
Thermo Scientific
TRACE 1300 and TRACE 1310 Hardware Manual
433
b. Keeping the module flap cover open, place the module in its seat. Be sure to insert the
25-pin male connector, on the bottom of the module, into the 25-pin female
connector on the detector seat of the detector housing.
c.
Use a T20 Torxhead screwdriver to tighten the three captive fixing screws without
overtightening.
.
d. Close the module flap cover.
9. Remove the plug and connect the analytical column end to the detector.
a.
Position the column so that the end of the column extends the proper distance above
the end of the ferrule as reported in
10. Open the gas supplies.
11. Check the gas supply for leaks.
a.
Use a handheld electronic leak detector (Thermo Scientific GLD Pro leak detector or
equivalent) to check each fitting for leaks.
b. If you detect a leak, tighten the connection and retest it.
ATTENTION
To maintain the correct alignment the screws must be tightened in turn.
Tighten each screw only a small amount before moving to the next screw. Repeat until all
are secure.
Table 17.
Column Insertion Depth For FID, NPD, TCD, ECD, and FPD Detectors
FID
NPD
TCD
ECD
FPD
Insert the column as far as goes and withdrawn about
2 -3 mm
23 mm
125 mm
Note
If you are installing an
In-Series Connection TCD
module (TCD module
modified for the connection in-series with a second detector or with a
methanizer), you must connect the vent line metal tubing, that protrudes into
the GC oven, to a
FID
second detector proceeding as follows:
• Being careful not to create too narrow angles, bend the vent line metal
tubing until its end reaches the bottom of the second detector.
• Making sure that the end
of the vent line metal tube is perfectly straight
, insert it
like as an analytical column through the proper detector retaining nut and
ferrule.
ATTENTION
If you are connecting the In-Series Connection TCD module to a
FID
,
NPD
, or
FPD
, position the vent line metal tubing so that the end of the
tubing extends the proper distance above the end of the ferrule as reported in
.
If you are connecting the In-Series Connection TCD module to an
ECD
, the
insertion depth of vent line metal tubing must be
21 mm
.