8
Installing Optional Kits
Installing a FTIR Make-up Module
Thermo Scientific
TRACE 1300 and TRACE 1310 Hardware Manual
399
b. Keeping the module flap cover open, place the module in its seat.
c.
Use a T20 Torxhead screwdriver to tighten the three captive fixing screws without
overtightening.
.
d. Close the module flap cover.
9. Connect the
1/16-in tubing provided.
a.
Connect an end of the 1/16-in tubing to the bottom fitting of the module using the
Swagelock® nut and ferrules provided.
b. Connect the other end of the tubing to the transfer line of the FT-IR spectrometer.
Refer to the
Nicolet iS50 FT-IR Spectrometer Manual
for details.
10. Open the gas supplies.
11. If external modules are present, plug the power cable to the AC Input connector of each
external module, and to the wall outlet.
12. Power on the GC.
a.
Plug the power cable to the AC Input connector into the back of the GC and to the
wall outlet.
b. Flip up the power switch (breaker) to the position I.
13. Close the front door of the GC.
ATTENTION
To maintain the correct alignment the screws must be tightened in turn.
Tighten each screw only a small amount before moving to the next screw. Repeat until all
are secure.