1
Installation
Coupling to a Mass Spectrometer
28
TRACE 1300 and TRACE 1310 Hardware Manual
Thermo Scientific
Figure 35.
Duct for the Coupling with a TSQ Quantum Mass Spectrometer
d. Place the GC right panel for your MS and attach the screw holding it in place.
3. Introduce the transfer line inner tube into the oven through the duct provided.
4. Attach the transfer line to the GC column using the proper nut and ferrule.
5. Close the front door of the GC.
6. Connect the transfer line heater to the
Aux Temperature/Cryo Module
. See
.
Figure 36.
Transfer Line MS Heaters
7. To tune and set the TSQ Quantum working conditions, refer to the
relevant
User Guide
and
Hardware Manual
.
TSQ Quantum
CAUTION - INSTRUMENT DAMAGE:
Make sure that the GC column has been
conditioned before connecting it to the transfer line. The material released from the
column, (column bleed), during conditioning may contaminate the detector.
Heater Connection for
Transfer Line 1
Heater Connection for
Transfer Line 2