Appendix B
SRS Residual Gas Analyzer
3
background peaks, the operating pressure should be kept as high as possible. The
background can be minimized by designing the tubing such that the effective pumping
speed at the RGA ionizer is as high as possible. Figure 2 shows two layouts that both
have the same “signal” level. The layout with the RGA at the end of a small tube has a
small effective pumping speed and will show a larger background level.
Turbo
Pump
Signal
RGA
Ionizer
Signal
RGA
Ionizer
Background
GOOD
BAD
Background
Turbo
Pump
Summary of Contents for RGA100
Page 4: ...SRS Residual Gas Analyzer iv...
Page 18: ...xviii Command List SRS Residual Gas Analyzer...
Page 46: ...2 14 Residual Gas Analysis Basics SRS Residual Gas Analyzer...
Page 66: ......
Page 78: ...4 12 Mass Filter Power supply SRS Residual Gas Analyzer...
Page 104: ......
Page 107: ...Programming the RGA Head 6 3 SRS Residual Gas Analyzer Error Byte Definitions 6 69...
Page 216: ...8 26 Quadrupole filter cleaning SRS Residual Gas Analyzer...
Page 246: ...11 2 SRS Residual Gas Analyzer...
Page 247: ......
Page 248: ......
Page 268: ...Appendix B SRS Residual Gas Analyzer 7...
Page 312: ...Appendix D SRS Residual Gas Analyzer 27...