8-6
Probe Bakeout
SRS Residual Gas Analyzer
Procedure
1. The quadrupole probe must be mounted on the vacuum system and at a base pressure
under 10
-6
Torr.
2. Turn off the RGA and disconnect the ECU from the probe.
3. Wrap a heating tape or heating jacket around the entire probe and cover with
fiberglass insulation if necessary. Make sure the entire probe, including flanges, is
evenly covered.
4. Bake the probe to at least 200
q
C for several hours (i.e. overnight).
5. After bakeout wait for the probe to cool down to room temperature before mounting
the ECU back on its flange.
6. Run the peak tuning procedure.
Summary of Contents for RGA100
Page 4: ...SRS Residual Gas Analyzer iv...
Page 18: ...xviii Command List SRS Residual Gas Analyzer...
Page 46: ...2 14 Residual Gas Analysis Basics SRS Residual Gas Analyzer...
Page 66: ......
Page 78: ...4 12 Mass Filter Power supply SRS Residual Gas Analyzer...
Page 104: ......
Page 107: ...Programming the RGA Head 6 3 SRS Residual Gas Analyzer Error Byte Definitions 6 69...
Page 216: ...8 26 Quadrupole filter cleaning SRS Residual Gas Analyzer...
Page 246: ...11 2 SRS Residual Gas Analyzer...
Page 247: ......
Page 248: ......
Page 268: ...Appendix B SRS Residual Gas Analyzer 7...
Page 312: ...Appendix D SRS Residual Gas Analyzer 27...