Getting Started With Autotest
CTS55
1094.0006.55 3.12
E-7
Status message
Phase RMS: run
Phase PK : run
Frequency : run
Ramp : run
Step 10
The phase and frequency errors
as well as the power ramp are
measured during this step.
Status message
Phase RMS: pass
Phase PK : pass
Frequency : pass
Ramp : pass
This message shows when the
test step is complete.
--------------------------------------------------------------------------------
-------------------------------------------
Status message
BER : run
Step 11
RBER II : run
RBER Ib : run
FER : run
Performing a bit error rate
measurement (BER).
Status message
BER : pass
RBER II : pass
RBER Ib : pass
FER : pass
This message shows when the
test step is complete.
--------------------------------------------------------------------------------
-------------------------------------------
Step 12 to 16
This is a repetition of the tests
eight to twelve for the second
user defined channel.
--------------------------------------------------------------------------------
-------------------------------------------
Status message
Network Release: run
Step 17
The speech link is cleared down
by CTS.
Status message
Network Release:
The link has been cleared down
correctly.
--------------------------------------------------------------------------------- --------------------------------------------
Summary of Contents for 1094.0006.50
Page 4: ......
Page 12: ......
Page 22: ......
Page 24: ......
Page 26: ......
Page 28: ......
Page 30: ......
Page 41: ...CTS55 Getting Started With Autotest 1094 0006 55 3 3 E 7...
Page 66: ......
Page 81: ...CTS55 Getting Started With Manual Test 1094 0006 55 6 7 E 6...
Page 83: ...CTS55 Getting Started With Manual Test 1094 0006 55 6 9 E 6...
Page 106: ......
Page 108: ......
Page 196: ......
Page 246: ......
Page 250: ......
Page 254: ......
Page 256: ......
Page 343: ...CTS K6 Windows Application CTSgo 1079 2001 01 87 E 3 Fig CTSgo help window...