Description of the Menus
CTS55
1094.0006.55 9.8
E-7
9.5.3
Autotest Running Menu (Pass/Fail)
In this menu the Autotest is running. This screen indicates the results of each step of the Autotest in the
pass/fail mode.
Once the Autotest has been started the CTS carries out the signalling tests in the following order:
Location Update (LocUpd)
Call to Mobile (Callto)
Echo Test (Echo)
Mobile Release (MSRel)
Call from MS (Callfrom)
When a test is in progress the box next to the test name blinks and the state message blinks in a
window above the signalling test names.
A successful test is indicated with a "
"
in the box next to the test. A failed test is indicated by a "f".
When the BER test has been completed on the last channel, the CTS will either attempt a handover
(HO) to the new band or a network release (NwRel). This decision will be made on the settings within
the Handover Details Menu.
If the result of the measurement within the specified tolerances the result is indicated as pass otherwise
as fail.
Stop
Pressing this key stops the measurement sequence. The Autotest Result screen will be displayed.
Values
Pressing this key switches from pass/fail indications to the actual test values as shown in the following
menu.
Summary of Contents for 1094.0006.50
Page 4: ......
Page 12: ......
Page 22: ......
Page 24: ......
Page 26: ......
Page 28: ......
Page 30: ......
Page 41: ...CTS55 Getting Started With Autotest 1094 0006 55 3 3 E 7...
Page 66: ......
Page 81: ...CTS55 Getting Started With Manual Test 1094 0006 55 6 7 E 6...
Page 83: ...CTS55 Getting Started With Manual Test 1094 0006 55 6 9 E 6...
Page 106: ......
Page 108: ......
Page 196: ......
Page 246: ......
Page 250: ......
Page 254: ......
Page 256: ......
Page 343: ...CTS K6 Windows Application CTSgo 1079 2001 01 87 E 3 Fig CTSgo help window...